MMarket PulseScope요청 / 문의
All market news
SEMICONDUCTORS

DB HiTek Lifts 200mm Foundry Prices by Up to 30% as Advanced Packaging Capacity Race Widens

South Korean foundry DB HiTek has raised prices by as much as 30% as Chinese orders push its 8-inch lines close to full utilisation, while packaging specialists from Shinko Electric to JCET accelerate capacity additions aimed at AI accelerators.

DB HiTek has raised foundry prices by as much as 30%, with Chinese customers facing the steepest increases, as rising orders push the South Korean foundry's 200mm capacity close to full utilisation. The scale of the increase highlights how tight mature-node capacity has become: 8-inch lines were widely treated as a commodity business, but a surge in Chinese demand for power management, display driver and mixed-signal parts has left little slack available for incremental bookings.

At the leading edge, the constraint has shifted from wafer fabrication to packaging. Shinko Electric Industries signed a purchase agreement on September 30 to acquire Japan Display's Mobara Fab in Mobara City, Chiba Prefecture, intending to turn it into a new core production hub dedicated to high-end semiconductor packaging for AI accelerators and data centre applications. The deal adds capacity at the precise point in the chain that has been the binding limit on AI chip output.

The advanced packaging race is also widening beyond traditional chipmakers. As fan-out panel-level packaging, through-glass via and micro-LED optical communications move closer to mass production, semiconductor equipment, materials and optoelectronics suppliers are repositioning to capture a share of the market. Chinese outsourced assembly and test providers are part of the same trend, with domestic custom ASIC accelerators entering volume production and routing to local OSATs.

For buyers, the implication is that pricing power now sits at both ends of the chain. Mature 200mm wafers are repricing sharply because supply has not expanded to match Chinese pull, while advanced packaging remains effectively sold out, so lead times and allocation rather than headline wafer prices are deciding who gets silicon delivered.

Sources